skip to main
|
skip to sidebar
SE2: VR Mini Hovercraft
Calendar
Showing posts with label
Developmental Work
.
Show all posts
Showing posts with label
Developmental Work
.
Show all posts
Wednesday, January 13, 2010
Plan of Procedures: Attach Skirt to Hull
Wednesday, January 6, 2010
Isometric View: Skirt
Skirt will be made out of a PVC coated polyester fabric
Monday, January 4, 2010
Orthographic Views of Hovercraft (With Labels)
Exploded View of Hovercraft (Parts Labeled)
Rendered Isometric View of Hovercraft
Plan of Procedures: Assembling Hull and Cavity Together
Plan of Procedures: Hull Assembly Steps
Plan of Procedures: Cavity Assembly Steps
Plan of Procedures: Materials Processing for Hull
Plan of Procedures: Lists
Older Posts
Home
Subscribe to:
Posts (Atom)
Labels
Background
(1)
Bill of Materials
(1)
Construction
(1)
Design Brief Specifications and Limits
(3)
Developmental Work
(10)
Drawings
(4)
Introduction
(1)
Logs
(60)
Materials Processing
(1)
Plan of Procedures
(4)
Press Release
(1)
Rationale
(3)
Research/Brainstorming
(2)
STEMM
(1)
Summer Work
(3)
Testing
(1)
Testing Procedures
(1)
Blog Archive
▼
2010
(51)
▼
June
(2)
Our Final Product
Testing Procedures
►
May
(8)
►
April
(7)
►
March
(8)
►
February
(8)
►
January
(18)
►
2009
(39)
►
December
(6)
►
November
(8)
►
October
(4)
►
September
(21)