skip to main | skip to sidebar

SE2: VR Mini Hovercraft

Calendar

Wednesday, January 6, 2010

Isometric View: Skirt


  • Skirt will be made out of a PVC coated polyester fabric
Posted by VR at 1:04 PM
Labels: Developmental Work, Drawings

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Labels

  • Background (1)
  • Bill of Materials (1)
  • Construction (1)
  • Design Brief Specifications and Limits (3)
  • Developmental Work (10)
  • Drawings (4)
  • Introduction (1)
  • Logs (60)
  • Materials Processing (1)
  • Plan of Procedures (4)
  • Press Release (1)
  • Rationale (3)
  • Research/Brainstorming (2)
  • STEMM (1)
  • Summer Work (3)
  • Testing (1)
  • Testing Procedures (1)

Blog Archive

  • ▼  2010 (51)
    • ►  June (2)
    • ►  May (8)
    • ►  April (7)
    • ►  March (8)
    • ►  February (8)
    • ▼  January (18)
      • Week 21 Log B
      • Week 21 Log A
      • Week 20 Log A
      • Week 19 Log B
      • STEMM Analysis
      • Plan of Procedures: Attach Skirt to Hull
      • Week 19 Log A
      • Week 18 Log B
      • Isometric View: Skirt
      • Week 18 Log A
      • Orthographic Views of Hovercraft (With Labels)
      • Exploded View of Hovercraft (Parts Labeled)
      • Rendered Isometric View of Hovercraft
      • Plan of Procedures: Assembling Hull and Cavity Tog...
      • Plan of Procedures: Hull Assembly Steps
      • Plan of Procedures: Cavity Assembly Steps
      • Plan of Procedures: Materials Processing for Hull
      • Plan of Procedures: Lists
  • ►  2009 (39)
    • ►  December (6)
    • ►  November (8)
    • ►  October (4)
    • ►  September (21)